da wp_1119381 | Mag 13, 2022 | Case stories
Installation of a new control system (ATEX area) in an existing fluid bed drier. Fluid bed charging and discharging phases optimisation in order to increase the containment. New Alcoholic solution preparation area dedicated to the revamped fluid bed dryer. Design,...
da wp_1119381 | Mag 13, 2022 | Case stories
Feasibility study for the installation of a new CHP and dismantling of the existing CHP composed of two gas engines. Feasibility study comprehensive of: CHP lay out, plant available utilities verification, utilities tie in list, new pipe rack definition. Purchase bid...
da wp_1119381 | Mag 13, 2022 | Case stories, Uncategorized
Installation of a new bioreactor in an existing production area. Design for: new bioreactor, relocated equipment, pure utilities and black utilities modification. Software design specification preparation. Equipments purchase/modification, installation coordination,...
da wp_1119381 | Mag 13, 2022 | Case stories
New Freeze Dryer area under isolator: URS, Functional Specification, schedule preparation, vendor coordination, installation coordination, support to Validation documentation and execution.